East Cobb BEFORE and AFTER Bathroom Makeover!

Bathroom remodels were the most popular home renovation project of 2020. And we have a great one to show you!

After years of living with the builder-grade master bathroom, this homeowner was so excited to get an updated East Cobb bathroom from ACA, Atlanta Curb Appeal! The upgrade included a roomy shower, a freestanding tub, and a gorgeous picture window.

This East Cobb homeowner learned about ACA from her neighbor across the street. We did a master bathroom improvement there, too. This home was built about 20 years ago, and the bathroom needed a little bit of shine.

 

First, ACA removed the framing and glass blocks from the previous shower to allow for more space inside. The glass blocks, while interesting 20 years ago, had not aged very well. Amazingly, the new glass shower walls opened up the space. On the walls, what appears to be a beautiful marble finish is actually 12X24 porcelain tiles. It looks stately! The porcelain tile that mimics the marble look is often preferable because it is more durable, affordable, and less slippery.

Next up, we removed the big, clunky Jacuzzi tub, which has fallen out of grace in home design for several reasons. They tend to leak over time and their size requires a huge fill-up of time and water. Plus, those old tubs take up valuable bathroom footage and are difficult to keep clean. Not a lot of benefits for all those drawbacks.

The beautiful window above the tub was custom-made to bring in light and accentuate a lovely view. And we were able to add gorgeous shiplap around the tub. The shiplap was not just a design feature; the wood will actually protect the drywall close to the tub.

Since we had to change up the wiring and make adjustments to the plumbing, ACA replaced the vanities and most of the drywall.

We also added new tile to the floors to match the flow and design of the bathtub and shower.

Even though there was a delay in the specially-ordered custom window, this bathroom remodel only took us six weeks. The homeowner was so pleased with the finished product! “She loved it,” according to Andy Anderson, co-owner of Atlanta Curb Appeal.

Ready to tackle your bathroom? Atlanta Curb Appeal has ideas and plans to bring your bathroom up to date! Contact us here. 

Want to read another Makeover Story? See this magnificent country club bathroom! 

Atlanta Curb Appeal remodels homes in East Cobb, Roswell, Sandy Springs, Milton and the surrounding areas. Give us a call if you are ready to upgrade your exterior or interior.

Read all our reviews on Houzz! Or Follow Us on Facebook so you can find us when you’re ready.

Gorgeous East Cobb Kitchen in Chimney Springs!

This beautiful, detailed renovation was completed in record time!

Our neighbors in East Cobb were looking to completely renovate the kitchen, master bathroom, flooring, and closet in their 1970’s home. Atlanta Curb Appeal did a major makeover that involved knocking out walls, moving an entire kitchen, and creating custom shelving. And they did it all in just six weeks!

ACA has done several renovations in the Chimney Springs neighborhood, so this family knew exactly whom they could trust for this major renovation, and they were very happy with the results.

The kitchen was very small and enclosed, with no room for an island. ACA took out three walls to open the space and relocate the kitchen; doing this they were able to create a much larger kitchen and island! Who couldn’t use a bigger kitchen for meal prep and entertainment? Beautiful subway tile and new modern lighting make this kitchen look straight from the pages of a magazine!

The sink in the island makes cooking on the stove a breeze!

Of course, moving the kitchen did come with challenges. Since the home was built on a slab, the master plumber used a video to locate the existing plumbing. That way they knew where to tie into for the new plumbing location. Using creative solutions at the start means less work on the back end.

The owners chose a newer line of cabinets – it is called York. They also chose to install top of the line quartzite countertops in a gorgeous style called Brazilian Taj Mahal.

The flooring is engineered hardwood. It is made up of a thin wood veneer on top. Underneath, there is a layer of high-density wood. Though the cost is comparable to traditional hardwood, engineered wood has become a very popular alternative because it is designed to reduce moisture issues that are common with traditional wood. It is also easier to install, which reduces labor costs.

ACA also gutted the entire bathroom and rebuilt the closet.

They added two windows to the bathroom, and installed custom shelving in the bathroom and closet in a farmhouse style. The shower now has a place to sit down if needed, and the frameless glass shower doors give a beautiful modern touch. The shower wall tile has an amazing pattern that is so unique you can’t take your eyes off of it!

Despite the beautiful finishes and rapid completion time, the project stayed within budget. The client could not believe it! They loved how it turned out!

Are you ready for your East Cobb Kitchen Remodeling job? Check out Atlanta Curb Appeal’s gallery here.

Give us a call if you would like a free estimate to remodel your kitchen, basement or home. We have high ratings and we stick to our deadlines.

Modern Industrial Farmhouse Bathroom in East Cobb

This client found Atlanta Curb Appeal after their last renovation from another contractor turned up less than satisfactory results. After interviewing several companies, they selected us. Their home was about 25 years old, so it was clearly due for a remodel.

Farmhouse Bathrooms East Cobb

We see this a lot in East Cobb, where young couples with kids are moving in and renovating these old traditional homes into brand new modern dwellings. It gets completed in stages. Each year they pick a project, so bit-by-bit, they are slowly getting it all done in style. This time it was the master bathroom’s turn!

Ready to Get Your Free Estimate from Atlanta Curb Appeal? 

To start off, Atlanta Curb Appeal performed a complete demolition of the bathroom space. We gutted the place entirely so that we could rebuild it from scratch. Although some ask if we can do a limited removal of the interior, we have found that doing so increases the chances of leaks and we can’t warranty work like that. Complete gutting also allows for more options, like knocking down an exterior wall for a more prominent window. Gorgeous natural light is hard to beat.

Freestanding Tub Installation East Cobb Marietta

After starting with a clean slate, we installed something we have seen more and more of here in Georgia, and that’s heated floors. Heated floors allow for the luxury of stepping out of the shower on a crisp, wintery day and not getting the chills from a shivery surface. New bathroom installations also allow for some great extras like a shower bench. His and her shower heads were another great new accessory.

See Atlanta Curb Appeal’s Bathroom Gallery Here

The client is a commercial designer by trade, so she was able to grasp and, in some cases, directly purchase precisely what she wanted style-wise. She chose the fantastic lighting fixture above the freestanding tub, and the beautiful wood and granite mixed vanity with black farmhouse-style faucets. The barn door entry was quite a find! She discovered it at an antique store. Admittedly, it was quite beaten up and dirty. We pulled the glass off, cleaned it up, stained it, and then we put it all back together. She talentedly selected most everything; we merely followed her drawings and wishes. Since she is a designer, she has a keen attention to detail. Many things had to be custom made, which takes more time and effort. The results, though, are breathtaking and worth it!

Finally, one new thing about this renovation was the squared framed shower doors. This upcoming style is becoming more popular on Pinterest and Houzz. Very few glass door companies produce them. They are custom doors and require a more significant expense and wait time for manufacture.

Their feelings post-renovation are ecstatic. They are super happy and love using their new bathroom. It’s magazine worthy!

Ready to update your East Cobb home? Atlanta Curb Appeal’s attention to detail and commitment to the budget are unsurpassed. Call us and set up your free estimate at 770-778-1172. Or see more pictures in our online galleries here.

Want to read another makeover story? Check out last month’s sumptuous bathroom with chandelier and custom Italian fixtures.

We Got to Be Their Remodeling Hero!

How Did Your Client Find You?

It is the strangest story! Her renovation contractor didn’t show up on Day 1 of her renovations. She quickly got on an East Cobb Mom’s Facebook group and asked for advice on what to do. Atlanta Curb Appeal was recommended. We met her in a day, agreed to a plan of action and we had our crew start work the next morning. Our client said that it was quite a whirlwind.She was thrilled that within 14 days, her home renovations including bathroom remodeling were completed!

Was it a small project since it only took two weeks?

Not at all. That’s what makes her story so amazing. Here is what she got in just two weeks:

  • New kitchen renovation with new cabinets and countertops
  • New bamboo hardwoods
  • New master bathroom remodel
  • New powder room remodel
  • New electrical work
  • New plumbing work
  • New recessed lighting
  • Interior paint on walls and trim throughout the whole house
  • New carpet upstairs

What are the benefits to having Bamboo Hardwoods?

Bamboo flooring is known for its strength, durability, it’s eco-friendliness and natural resistance to insects and moisture.

BambooFlooringAtlantaCurbAppeal

Are they more costly?

Bamboo hardwoods are not much more expensive. It is not popular with homeowners yet, but its interest is growing. One caveat is that it should only be used in areas where there is not excessive moisture. That can damage it.

Tell us about the Master Bathroom Remodel.

The master bathroom turned out beautifully. It was complete makeover! Everything was demolished during the demolition phase and built from the ground up.

We put in new bathroom floor tile with coordinating wall tile around the shower and tub. Then Atlanta Curb Appeal installed frameless glass shower doors, which are very popular. The client chose white shaker style vanities and lighting throughout. The new lighting required a fair bit of electrical work. We then finished off the bathroom remodel with mirrors, towel bars, new paint, and baseboards. It is truly a brand new space. You wouldn’t recognize it from the before pictures!

BathroomNewTileAfterAtlantaCurbAppeal

Why did they want to update their home, did they have problems with the layout? 

No technical problems existed; they were just ready to upgrade the look of the original house.

Are they happy with their finished home?

Absolutely! They sent us a thank you note (see below) and have already referred us 3 new clients! We are so happy that we could make their dreams come true on time.

Here is just one of the testimonials they sent us.

Good evening Avi and Andy,

We just wanted to touch base with you and let you know how much we appreciate all of the hard work you have been putting into our house. Sometimes it’s easier to gripe on the bad not knowledge all of the good. We hope you know how much we love all of the wonderful things you have done for us and our home. Although this has been challenging at times, you have made this experience a very bearable endeavor. This journey would definitely not have been possible without the two of you. Your guidance and expertise are one in a million. You have said from the beginning to buckle up, so thank you for taking us on this journey called home renovations. You are making our dreams a reality by turning our house into our home. So from the bottom of our hearts thank you!!!

All our love,

Ashley and Johnathon

 

Looking for more Kitchen Remodeling Ideas? Check out this blog post about a we did last month.

Astonishing Transformation of this East Cobb Home!

750BeforeAfterMakeoverECApril2015

Recently Atlanta Curb Appeal wrapped up another amazing whole house makeover in East Cobb, GA!  Below is an interview with owner Avi Moyal about the details of the project. It’s a great story including a little bit of mystery we hope you will enjoy reading.


How did they find you?

Well this is a very interesting story…

I got a call one day, asking me to come and give a quote for some curb appeal work. As always, I ask my new clients, how did they find me? This lovely lady said she is holding a postcard I had sent her in the mail recently. I was shocked to hear that because the only time I did mass postcard marketing was exactly 3 and half years ago. I had to go and see it with my own eyes, so I got in my car and drove straight to her house. And there it was, the postcard I printed almost 4 years ago was there in her hand! No idea how that happened. A mystery maybe the USPS can solve for me!

Why did they select Atlanta Curb Appeal? Did they get other quotes?
The client got 3 quotes, one was a little lower than ours but she did not feel that he could deliver. The second quote was considerably higher than mine. She went with ours because she liked the design ideas I proposed.

A few years ago she had the front landing and stairs done and she didn’t like how it turned out at all. So we came up with a new design that included demolishing the existing one and building it from scratch, which we then covered with a beautiful natural stone all the way to the driveway.

What projects did you complete in the home?
Refinish the hardwood floors
Replace the front door
Fix the rotted cedar siding
Demolition the front porch and rebuild new rounded stairs and cover with natural stone.
Build a portico
Dramatic exterior change using new paint palette
Paint the deck and railing
Replaced all exterior lights
New custom made shutters

Why did they choose to have the hardwood floors refinished?
Actually she hadn’t decided to do it until our initial meeting. They were very scratched, basically due to common wear and tear. During my first assessment, I asked her if she would like to go ahead and refinish them while we were in there doing the renovations. It’s a simple process really since they are solid hardwoods, easily sanded and refinished to any shade one could want.

What caused the rotted cedar siding? Was this instance typical of homes of this age? Or was it due to a manufacturer problem?
Some decay is normal, part of the aging of the natural cedar siding. Overall though, the siding was in decent condition. Merely a few critical places needed to be removed and replaced.

IMG_3202

Why did they want to add a portico? What was their inspiration?
We went over a few designs however they really liked the portico that is featured on our homepage. Actually the whole color scheme of the exterior of that house was really appealing to them so we went with the same color formulas. Gray with white and black accent and trim colors.

SubstandardFullSizeRender

Was gray in color in mind from the start?
She had gray in mind from the start but not the actual shade of it. All the colors were discussed together and the red door was her special request.

Why was the front door replaced instead of painted?
The client wanted a new door and sidelites to give a reinvigorated look to the front of the house and to accentuate the attractive new portico.

Deck Painting Atlanta Curb Appeal

Did you have to resurface the deck before painting?
No, it was in good condition, we kept the deck as is, we only pressure-washed and repainted it. Because it had been painted in the past, we couldn’t merely apply a stain over the old deck. The new deck colors were chosen to complement the new exterior, white for the railing and light gray for the floor decking. The results were amazing, way beyond our expectations!! There is such a clean and neat feeling there now.

New Deck Repaint Atlanta Curb Appeal

How many days for each phase of this project?
In a perfect world:
Paint – 1 week
Floors – 3 days
Front stairs – 1 week
Portico – 5 days
but we were there for almost two months because of rainy days.

Artistic Door Numbers

We also installed a new house numbers sign that matched the new look. When we took off the old door, the client wanted to keep these 4 digit metal numbers as a souvenir. I offered to take it home and do something artistic with it.

Did they book the bathroom remodel job after they saw and loved your work or was this always in the original plan?
Yes the bathrooms came much later in the process; we will start them in a couple of more weeks probably.

Are they happy with the finished results?

Customer Review Atlanta Curb Appeal

The day we finished, after I got home that evening, I got a text from them saying ” I like it all so much Avi that I’m crying I’m so happy. I just can’t believe I have a pretty house after 20 years. I wish my mother could see it now. Thank U Avi” (see above).

This filled my heart with joy knowing we made someone that happy with our work.


 

Sign Up for our Newsletter to Get Stories like these once a month.

Would you like to read more makeover stories? Here is an amazing backyard makeover we completed last fall.

Click here to see her review.